Our work
Real jobs, photographed on site
These are Alex's own photos from jobs around North London. Open boards show the wiring before the cover goes on, because tidy work inside is what keeps a house safe.

Gallery
Boards, wiring and upgrades
-
Consumer unit, labelled -
Neat wiring inside the board -
Board with a time switch -
Two boards, one job -
New board on the wall -
Every circuit to its breaker -
The double board, another angle -
Upgrade finished -
Double board, near the end
What you see in the photos
Tidy inside, not just on the outside
Cables dressed and labelled
Each circuit goes to its own breaker and is labelled, so the next person can read the board.
Tested before he leaves
Every circuit is tested before the cover goes back on and the job is handed over.
The house left clean
Floors and furniture covered while he works, cleaned and hoovered at the end.
Want your board looking like this?
Send a photo of your current fuse board on WhatsApp and your postcode.